From:                              route@monster.com

Sent:                               Saturday, April 16, 2016 2:07 PM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: NSN Construction Manager

 

This resume has been forwarded to you at the request of Monster User xapeix03

Michael Wolfe 

Last updated:  04/04/15

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


McDermott, OH  45652
US

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Michael Wolfe - Construction Manager

Resume Value: b7kcrrmmk42psc33   

  

 

MICHAEL WOLFE

mewolfe121515@gmail.com

Home#740-372-6027

Cell#740-961-3631

 

 

EXECUTIVE SUMMARY:

More than 20 years' experience in all phases of Telecommunications installation and project management, from start to close out. I'm effective and efficient in installation from site survey to completion. I have good managerial, computer, trouble shooting and problem solving skills.

 

SKILLS:

Including but not limited to installation and management of Nokia and Ericsson and various equipment includes UMTS, MGW, BSC, TCSM, RNC, NEMU, OSS, BSC/TCSM COMBI, 3I, SDC, HLR, NEXT GEN HLR, SGSN, FLEXI, ULTRASITES, Sun and HP Servers, Ericsson MSC, BSC, RRU, RBS 2106 and 2206. Pim, Anritsu and Fiber testing, Precon, QA .AC, DC and Generator maintenance repair, power termination, communication cable termination, lacing, interpreting floor plans, redlining construction drawings and prints, troubleshooting, overhead and under floor auxiliary framing and substructures, installation of ladder rack, use of all associated power tools. Installation, preparation running and termination of all communication and power cabling from copper to fiber. Decommission an removal of COE and cell site equipment.

Cell site audits and surveys on T-Mobile, AT&T, Sprint, Verizon and Cincinnati Bell locations.

 

PROFESSIONAL SUMMARY:

 

Selfempolyed Cell site generator maintance                          Nov 2014-Present

 

Pinnacle /NSN                                                     Sep 2014-Nov 2014

Construction Field Manager L1900/L700

  Management of daily field operations.

• Attended needed project meetings at a market level covering all areas from Quality, Progress, Logistics and Reporting.

• Located both in the office and in the field with most emphasis in the field.

• Evaluates GC field staff and quality of work by visiting his/her BTS sites daily.

• Oversaw multiple site build projects at once and is responsible for supervising the staff at each site ensuring that all projects are completed on agreed schedule and that standards of quality are met.

• Provided construction management for installation of new cell sites and modification of existing sites.

• Monitored status of site walks, material delivery, and identify/report challenges to market project/program management.

• Demonstrated the ability to think critically through a process, anticipate challenges, and prepare solutions in advance.

• Has ability to identify inefficient processes and make recommendations for improvement.

• Assist with BOM ordering and oversee receipt and distribution of materials, and manage local warehouse inventory.

 

 

Blue Stream ProfessionalFeb 2014 - Aug 2014

Construction manager

·               Construction management, ordering equipment, tools and material. ERF submitting, time approval, site quality reports and JHA. NTP, BOOM, AMF.

·               QA, SIIM, Power Point, Site Tracker.

 

Pinnacle Jan 2013 - Dec 2013

NSN/TMO Moderization/ Construction Manager

Customer: NOKIA/T-MOBILE

 

Management of daily field operations

• Attended needed project meetings at a market level covering all areas from Quality, Progress, Logistics and Reporting.

• Located both in the office and in the field with most emphasis in the field.

• Evaluates GC field staff and quality of work by visiting his/her BTS sites daily.

• Oversaw multiple site build projects at once and is responsible for supervising the staff at each site ensuring that all projects are completed on agreed schedule and that standards of quality are met.

• Provided construction management for installation of new cell sites and modification of existing sites.

• Monitored status of site walks, material delivery, and identify/report challenges to market project/program management.

• Demonstrated the ability to think critically through a process, anticipate challenges, and prepare solutions in advance.

• Has ability to identify inefficient processes and make recommendations for improvement. Part of the National NSN Site Close out Package Team and Punch list reviews and real time tracker.

 

Ericsson  /T-Mobile, AT&T Sep 2011 - Dec 2012

Ericsson site Team Leader

·               Supervise and oversee installation of various Ericsson Core Telecommunications and power equipment in customer central offices.

 

AT&T May 2011 - Sept 2011

Ericsson integrator

·               Installation and  integration of Ericsson RBS UMTS and LTE equipment.

 

Alpine Power AUG 2010 - MAY 2011

FIELD MANAGER, SUPERVISOR

·               Installation of Ericsson 2106 RBS and RRU's , Decommission of Nokia equipment and power bays,, running AC/DC power for Nokia upgrades, battery cabinet installation, removing and installing various outdoor power plants, generator maintenance, site surveys and quality audits.

 

Time Warner Telecom MAY 2009 - AUG 2010

INSTALLER/TESTER

·               Installation of Alcatel TSS5 and TSS100's, ADVA's and miscellaneous equipment for TMO and Verizon, running all related cables, testing fiber and padding as required, performing testing with T-Berd 6000/8000, installation of Cisco 7609, Juniper and various routers.

 

T-Mobile/Verizon JAN 2009 - MAY 2009

SITE SURVEYOR, PROTECH

·               Site surveys for customer cell sites, including listing of all equipment, site drawings, pictures, antennae types, power and generator.

 

S-Com  /T-Mobile, AT&T, Bell Canada, Rogers, Iowa Wireless

JAN 2008 - JAN 2009

NOKIA INSTALLATION LEAD

·               Supervised installation of various Nokia Core central office telecommunications equipment from JSA to acceptance and sign off Installation included receiving all appropriate paperwork, receiving all materials, customer walk through, interpreting floor plans, mounting, grounding and powering equipment, populate equipment, connection of inter-bay and cables, running all external communication cables, terminating LAN lines with RJ45's, all necessary labeling, ensuring all Network Elements are properly communicating, racking and mounting various HP and SUN servers, project completion and handover to customer.

 

IBEW

JULY 2003 - JAN 2008

PROJECT COORDINATOR/SUPERVISOR

·               Complete upgrade of tele data infrastructure at various school systems in southern Ohio, including layout and installation of all cable, fiber and related equipment and connectors, video cameras, CATV, door sensors, mounted rack in equipment rooms, patch panels, monitors and panic switches. All related electrical and conduit as required by state of Ohio.

 

S-Comm  /T-Mobile, AT&T, Cingular   JAN 1994-JULY 2003

NOKIA AND ERICSSON INSTALLATION SUPERVISOR

·               Supervised installation of various Nokia and Ericsson Core central office wireless and land line telecommunications equipment from JSA to acceptance and sign off.

·               Installation included receiving all appropriate paperwork, receiving all materials, customer walk through, interpreting floor plans, mounting, grounding and powering equipment, populate equipment, connection of inter-bay and cables, running all external communication cables, terminating LAN lines with RJ45's, all necessary labeling, ensuring all Network Elements are properly communicating, racking and mounting various HP and SUN servers, project completion and handover to customer.

 

 

 

MILITARY

·               USMC

·               Telecommunications and equipment maintenance

·               Honorable Discharge.

 

EDUCATION

Shawnee State University

Degree; Associate Plastic

 

CERTIFICATIONS:

·               Nokia and Ericsson COE and Cell site Equipment Installation

·               All required AT&T Training,

·               Adult CPR instructor

·               BICSI A tech

·               OHSA 10

·               Fiber Splicer

 

Referrences:

 

David Chapman; Nokia national Manager  469-235-6700

Bhaskar Malhotra; Nokia PM   973-337-0763

Milosz Nowicki;  Nokia PM    972-876-9559



Experience

BACK TO TOP

 

Job Title

Company

Experience

Construction Manager

Pinnacle Technical Resources, Inc.

- Present

 

Additional Info

BACK TO TOP

 

Desired Salary/Wage:

100,000.00 - 125,000.00 USD yr

Current Career Level:

Manager (Manager/Supervisor of Staff)

Date of Availability:

4/10/2015

Work Status:

US - I am authorized to work in this country for any employer.

Active Security Clearance:

None

US Military Service:

Yes

Citizenship:

US citizen

 

 

Target Job:

Target Job Title:

Construction Manager

Desired Job Type:

Temporary/Contract/Project

Desired Status:

Full-Time

 

Target Company:

Company Size:

Industry:

Telecommunications Services

Occupation:

Building Construction/Skilled Trades

·         General/Other: Construction/Skilled Trades

 

Target Locations:

Selected Locations:

US

Relocate:

Yes

Willingness to travel:

Up to 100%

 

Languages:

Languages

Proficiency Level

English

Fluent